FORCE 10 CONSTRUCTIONS

A tried and proven building methology for over 20 years

The Force 10 Engineered Building System is a breakthrough in innovative construction and has been designed to use a minimum number of modular components. A galvanised steel frame is at the core and the floor, wall and roof systems are totally integrated and all components lock together easily and smoothly. The steel frame is made of BlueScope Australian steel.

Force 10 is particularly competitive in remote areas because of its ability to be “flat-packed” and its rapid construction. It is cyclone resistant, fire resistant, termite resistant and has excellent inbuilt insulation. It is a clean and green building product with an energy rating of up to 9.5 stars.

Build fast with Force 10

  • Build Speed A Force 10 building can be constructed to lock up stage much faster than a conventional building due to our modular floor, wall and integrated roof system. On past projects we have taken a 150m2 house to lock up stage in just 14 days – this is in the region of 50% more efficient site construction time than most conventional building projects.

  • Secure Product Supply The Force 10 product is manufactured in a controlled, secure factory environment thus ensuring that the capacity to supply the materials is not affected by external factors such as weather, vandalism, or theft. Secure product supply is a significant time saver in ensuring that project timelines are met and milestones achieved on time.

  • Off-site Manufacture  The Force 10 building system is manufactured totally off-site and arrives ready to erect with everything to lock up at hand.

  • Delivered At Once Significant delays can arise in construction when waiting on the many deliveries to arrive for conventional building projects. Conventional building systems could require up to 70 deliveries with as many or more follow-ups with suppliers. By contrast, our system means all items required to take a building to lock up arrive in just one delivery. This is particularly useful for remote projects where the lack of one small item on the project can cause days or even weeks of delays.

  • Quality and Strength The quality, strength and durability of the Force 10 solution means that additional delays in replacing damaged walls (such as plasterboard in conventional buildings) are eliminated. Our product is made from steel and is virtually indestructible. We use weather resistant materials which means no “down time” due to rain or water damage.

  • Design An in-house design office fast tracks building designs and compliance to the relevant international building code. They have partnerships with engineering consultants, architects, air and hydraulic consultants and all of the resources that are required to ensure that a quick project start up will be achieved

The Force 10 Design

  • Force 10 Floor System The Force 10 floor system is manufactured from galvanised steel. It bolts securely together and can be installed on steel stumps with traditional concrete footings. Compared with conventional concrete slab flooring, the time-saving benefits of using the Force 10 floor system are impressive. Force 10 – Floor SystemThe delay whilst earthmoving equipment shift and compact earth for a concrete slab prior to installation is eliminated.The Force 10 floor system can be installed on sloping and uneven surfaces. A concrete slab takes 7 or more days to cure (weather permitting) prior to the erection/construction of the building. No such delays are incurred with the Force 10 floor system. However, If preferred, our wall panels can easily be erected on top of a prepared concrete slab.

  • Force 10 – Anchor System Force 10 Mega Anchor System The Force 10 floor system is manufactured from galvanised steel. It bolts securely together and can be installed on steel stumps with traditional concrete footings. Compared with conventional concrete slab flooring, the time-saving benefits of using the Force 10 floor system are impressive. Force 10 – Floor SystemThe delay whilst earthmoving equipment shift and compact earth for a concrete slab prior to installation is eliminated.The Force 10 floor system can be installed on sloping and uneven surfaces. A concrete slab takes 7 or more days to cure (weather permitting) prior to the erection/construction of the building. No such delays are incurred with the Force 10 floor system. However, If preferred, our wall panels can easily be erected on top of a prepared concrete slab.

  • Force 10 Wall System The Force 10 wall system is a panelised wall system, in which the panels are manufactured to close tolerance allowing the walls to be erected on site faster than normal construction projects. The wall panels are manufactured in our factory (no on-site construction) and arrive on site finished, ready for setting and painting. Conventional buildings require additional time for construction and finishing walls, followed by filling the nail and screw holes. In addition, the manufacture on the Force 10 wall system allows for tight quality control tolerances – which facilitates more time saving and standardises quality.

  • Force 10 Roof System All Force 10 steel roof trusses are fully fabricated and trial assembled in the factory. The trusses are then identified as to their type and design, then folded flat to produce a compact truss which is then packaged and stacked in a container ready for shipping.This simple but important step greatly assists on site productivity, accuracy and efficiency and is a highly valued on site labour saving feature of our system.

  • Integration of the floor, wall and roof systems The three systems are fully integrated to ensure easy erection and maximum on-site efficiency